Friday, January 3, 2014

Pallet and Floors

Dad and Mom came up to the farmhouse and helped us out tons. Cory and Dad took out the old sub-floor of the bathroom to find some beautiful pine floors. They also took out the old toilet and replaced it with a new one that Dad shipped from Bellingham. They shipped a pallet weighing over 1200 lbs. It contained all sorts of fun surprises. They shipped my childhood bed set, an organ, sewing machine, old clothes, toilet and lots of fun water toys. Unfortunately the truck would not come over the wood bridge down the road from us, so Dad, Cory and the driver pushed the 1200 lb load on a pallet jack for over 1/2 mile. It was quite the adventure, but we are thrilled to have all these amazing things out there.

Here is the sewing machine...
 We also had a light installed in the parlor
 the floors were removed from the bathroom
 Cory taking out the toilet
 The door to the bathroom was re-hung.
 View from the other side of the door
 Here is the organ that was delivered on the pallet
 We also brought out the secretary that my folks finished for us over the summer

No comments:

Post a Comment